RM_X02

Team-02-B&W.gif
Team-2-Model.gif

PHYSICAL MODEL

DIGITAL MODEL

PROCESS

EQUILIBRIUM MODEL  / EXPERIMENT TWO

This project explores the architectural moment created by the adjustable base system in the equilibrium model. The bend, cutting through two floor slabs, is treated as a continuous special wall throughout the structure to support the slabs.

Yidong He

Eva Liu

Yumeng Zhao